“The first base slab of the Mumbai Bullet Train station was laid at a depth of 32 metres on November 30,” National High Speed Rail Corporation Limited (NHSRCL) said on Wednesday (December ...
Mumbai-Ahmedabad High-Speed Rail (MAHSR) project, stations along the corridor will feature state-of-the-art facilities and design features aimed at providing a seamless travel experience.
The first concrete base slab of the Mumbai Bullet Train station has been cast, on November 30, 2024, at a depth of about 32 metres from the ground level, which is equivalent to a 10-storey building.
Mumbai-Ahmedabad Bullet Train Progress ... polycarbonate material. The train itself is designed to minimise noise inside. Its body is made of double-skin aluminium alloy, which helps reduce ...
Mumbai: The National High Speed Rail Corporation (NHSRCL) has completed 52% of the excavation work for the under-construction, proposed 32-meter-deep Bandra Kurla Complex (BKC) bullet train station.